Loadwell the lifting scheme can effectively reduce the plant construction cost:
Optimize the steel structure calculation: reduce the dead weight of the crane, reduce the wheel pressure, improve the effective lifting height and reduce the civil engineering cost;
Compact structure design, optimize the side limit size, reduce the blind area, improve the utilization rate of the plant, save energy, reduce emission and protect the environment.
Crane type: